Skip to content

You are here:

KRF 40.10

Heavy-duty crane work in underground mining operations

The PAUS KRF 40.10 with its 10t hook load is excellent for the fast and safe re-railing of e.g. derailed wagons in underground mining. Its telescopic boom provides the necessary flexibility for lifting operations of all kinds in track-guided mines. The massive 4-point support makes it a safe lifting aid for heavy loads. The Paus KRF 40.10 can be adapted to many requirements with many configuration options such as remote control, track width 750 mm or optionally 900 mm, camera system or gas warning system.

 

Produkt Highlights

  • Hook load up to 10t
  • Suspended running gear
  • Telescopic hook boom
  • Massive 4-point support
  • Compact dimensions (W 1.300, H 1.650mm)

Details

  • Special mining design
  • Crane remote control
  • Independent due to diesel drive
  • Compact, robust and easy to maintain
  • Standard mining safety package (ROPS/FOPS and more)
  • Ergonomically designed controls increase comfort and efficiency
  • LED light package

Options

  • Gas detection system
  • Video camera system
  • Video recording system
  • Crane remote control
  • Engines with different exhaust gas stages
  • Fire fighting systems different versions
  • Central lubrication system
  • Track gauge 750 or optionally 900 mm
  • Welding device 180 / 400 A
    230 V / 400 V
  • Compressor
  • High pressure washer
  • Paus Connect and much more

Further Versions


KRF 40.10 - with 10t hook load for fast and safe rerailing of e.g. derailed wagons in underground mining.

 

KRF 40.10 - with 10t hook load for crane work for recovery the machines in the track bed.

 

KRF 40.10 - with 10t hook load for fast and safe track maintenance

 

Back to top of page